GERT

Tail-risk intelligence

ERCOT / Operational tail-risk intelligence

See the grid edge
before it becomes the event.

A decision surface for rare-demand tails, capacity stress and evidence-backed intervention.

TargetT+01:00Updated
01 / Decision signal
LOWNext-hour system risk
N/A/100
AWAITING MODEL
Operator brief

The decision layer is waiting for a compatible prediction service.

No forecast is substituted or fabricated while the live service is unavailable.

02 / System boundary

P99 capacity margin

GW

Expected / P50

Extreme / P99

Temperature

32.0°C

Wind signal

15.0 m/s

AWAITING SOURCE
03 / Uncertainty geometry

One forecast. Four confidence boundaries.

Quantile engine

Forecast boundaries unavailable

The interface will not invent a distribution.

04 / Grid context

ERCOT interconnection

System
CAISOERCOTPJMNYISO
Spatial context only. The active forecast is system-wide, not a fabricated weather-zone estimate.
05 / Controlled intervention

Stress the weather.
Keep the evidence.

Adjust the physical drivers, rerun the same decision pipeline and compare against the live snapshot.

Temperaturesync pending

32.0°C

Wind speedsync pending

15.0 m/s

Solar inputsync pending

800 W/m²

Load context

Estimated fallback

Capacity basis

Configured reference

Model artifact

Stub / demo

Decision contract

P50 → P99 + provenance